Difference between revisions of "Blind Date"

From Monoskop
Jump to navigation Jump to search
 
(One intermediate revision by one other user not shown)
Line 5: Line 5:
  
  
Performance description:  
+
* http://www.aec.at/totalrecall/en/2013/07/30/nightline/
 +
 
 +
 
 +
Blind date was realized with 2 computers, one for audio, one for video, and 8 players (= PD programmers). Two people are programming on the same PD patch and after a certain time a programmer is exchanged and must continue the work on the already existing patch. An additional referee controls the exchange of the participants and so the result of the performance. The 2 patches (one video and one audio patch) and the video output are projected, so that the visitors can follow the process of programming.
 +
 
 +
 
 +
Performance full description:  
 
http://pd-graz.mur.at/blind_date_description
 
http://pd-graz.mur.at/blind_date_description

Latest revision as of 18:10, 15 March 2017

blind date is an audiovisual piece by pd~graz for a varying amount of players and has so far been performed at:



Blind date was realized with 2 computers, one for audio, one for video, and 8 players (= PD programmers). Two people are programming on the same PD patch and after a certain time a programmer is exchanged and must continue the work on the already existing patch. An additional referee controls the exchange of the participants and so the result of the performance. The 2 patches (one video and one audio patch) and the video output are projected, so that the visitors can follow the process of programming.


Performance full description: http://pd-graz.mur.at/blind_date_description